Motus

Location: Innovation Drive, Hull

Client: Ashcourt Construction

Sector: Commercial

Services: Passive Fire Survey

Project details

Helix FMS was appointed by Ashcourt Construction to deliver a full passive fire protection survey and remediation package at Unit B of the Motus development, located on Innovation Drive in Hull. As a newly constructed commercial facility, ensuring compliance with fire safety regulations from the outset was critical for handover and long-term occupancy.

Our work covered the ground and first floors and included: A full survey of all fire-rated walls across both floors, identification and photographic documentation of all penetrations and voids, provision of a detailed report outlining required remedial actions, installation of certified fire protection seals by our qualified installers, verification of completed works with post-installation photographs and compilation of a Passive Fire Protection Register, including marked-up drawings for client reference.

During our initial and follow-up surveys, each identified defect was highlighted with photographic evidence and detailed descriptions, ensuring full transparency for the client. Every completed penetration was sealed using certified fire-stopping systems by Helix FMS’s trained installers in accordance with industry standards and manufacturer guidelines.

In high-use commercial environments, proper fire compartmentation is not just about compliance; it’s about protecting people, property, and business continuity. By proactively addressing fire-stopping requirements, we helped the client ensure long-term safety and reduced the risk of future regulatory issues.

Planning a commercial development or need post-construction fire compliance? Get in touch with Helix FMS for expert fire safety solutions and detailed reporting from the industry’s trusted specialists.

Previous
Previous

Holy Name Rehabilitation Centre

Next
Next

Magdalen Park Care Home